Construction of one engineered sanitary landfill cell lined with GCL (Geosynthetic clay liner), Geomembrane, Geo-composite, and Geotextile. The cell extended the landfill life 10 more years with a capacity of 300,000 m3. The works included installation of a leachate collection and pumping system.