image_2_resized
image_2_resized

Ghazzeh Landfill

Construction of two engineered sanitary landfill cells perfectly isolated with leachate and gas management: cell 1 to house the waste available in the open dump, (estimated at 50,000 m3), while cell 2 to receive the fresh waste after the closure and capping of cell 1.

Copyright © Verde 2024 — All rights reserved.